Notes for installation of BGA rework stations
- Sep 07, 2018 -

Installation           


AInstallation sites

In order to ensure that the useful life of BGA rework station, installation of repair station must meet the following conditions:

1.Away from flammable and explosive materials                  

2.Do not splash water or other liquids

3.Well-ventilated , dry place            

4.Stable , flat areas less susceptible to vibration

5.Place less dust               

6.Prohibit Placing heavy objects on top of the touch screen

7.Without the influence of air-conditioners, heaters and fans

8.Reserved for 30cm to move and rotate around the upper for the back of rework station


BPower supply

INPUT :220AV±10% 50Hz±3

 

Previous: No Information

Next: No Information

    Contact Us
  • +86-0755-29091822
  • Sales31@dinghua-bga.com
  • 4th Floor, Block 6B, Shengzuozhi Industrial Park, Xinyu Road, Shajin, Baoan, Shenzhen, China
    JOIN US